|
|
|
|
|
Premium Builder's Package
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Includes the Following:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
click on the icon to the left to download and print our package contents
|
|
LOGS AND HARDWARE SYSTEM
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Wall Logs:
|
|
|
|
|
|
|
|
All
the Kiln Dried, Eastern White Pine Logs needed for the 1st story exterior
walls. All logs are independently
|
|
graded to the highest building standards. Each log is machine planed,
uniformly milled, visually inspected and
|
|
hand
sorted to maximize quality. Full logs provide superior energy efficiency for
exterior walls.
|
|
|
|
|
|
|
|
|
|
|
|
|
Log Plate:
|
|
|
|
|
|
|
|
All
the graded 2" x 4", 2" x 6" or 2" x 8" #2 or
better lumber for the starter plate. This enables the logs to be
|
|
fastened to a solid continuous surface. This plate will help in leveling and
squaring your log walls.
|
|
|
|
|
|
|
|
|
|
|
|
|
Engineered
Log Fasteners: (OLYLOG
by OMG )
|
|
|
|
All
the tempered and coated, engineered log fasteners needed for fastening all
logs @ 18" on center. These
|
|
engineered log fasteners require no pre-drilling and countersink themselves;
therefore reducing construction time.
|
|
Installation bits are included.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Log Home
Caulking: (LOG BUILDER
by SASHCO )
|
|
|
All
the special tan colored caulking needed for stacking the logs. Large, 30
ounce tubes reduce construction
|
|
time.
Log Builder caulk is guaranteed to stay flexible for 20 years. Specially
formulated as a log home sealant, it is
|
|
used
on the top of all logs, at corner joints and butt joints.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Hardwood
Dowels:
|
|
|
|
|
|
|
All
the 7/8" Hardwood Dowels needed for the corner joints and butt joints.
Combined with caulk, these dowels
|
|
provide a perfect seal to prevent weather from entering your home.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Foam
Insulation Gasket: (by
EMSEAL)
|
|
|
|
|
All
the 3/8"x1/2" Asphalt Impregnated foam gasket needed for stacking
the logs. The gasket is placed on top
|
|
of
the log to provide excellent sealing. EMSEAL gasket is decay resistant,
insect resistant and waterproof.
|
|
After
installation, this gasket swells and totally eliminates any possibility of
water and air infiltration.
|
|
|
|
|
|
|
|
|
|
|
|
|
1ST STORY SUB-FLOOR SYSTEM
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Girders: ( Support Beams )
|
|
|
|
|
|
|
|
|
All
the graded 2" x 12", #2 or better lumber ( crawlspace ) or
Engineered LVLs ( basement ) needed
|
|
to
support the floor joists.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sill Plate:
|
|
|
|
|
|
|
|
All
the graded 2" x 8", pressure-treated #2 or better lumber for the
top run of the foundation wall. This keeps
|
|
moisture
in the foundation walls from reaching the floor joists.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Rim Joist:
|
|
|
|
|
|
|
|
All
the graded 2" x 10", #2 or better lumber needed for the perimeter
of the subfloor.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Floor Joist,
1st Story:
|
|
|
|
|
|
All
the graded 2" x 10", #2 or better lumber for the floor joists
spaced at 16" on center to ensure a strong, firm subfloor.
|
|
|
|
|
|
|
|
|
|
|
|
|
Blocking:
|
|
|
|
|
|
|
|
|
|
|
All
the graded 2" x 10", #2 or better lumber placed under log walls
that run parallel with floor joists.
|
|
Blocking adds strength to the floor system and adds support to the log wall.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Subfloor
Decking, 1st Story:
|
|
|
|
|
|
All
the 3/4" tongue and groove premium grade subfloor underlayment. These 4'
x 8' sheets carry a 50 - year
|
|
limited warranty against delamination and swelling from water for superior
performance.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Bridging:
|
|
|
|
|
|
|
|
|
|
|
All
the light tension, metal bridging needed for the floor joists at 16" on
center. This keeps the bottom
|
|
of
the floor joists from deflecting thus preventing floor sag.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Subfloor Adhesive:
|
|
|
|
|
|
|
|
|
|
All
the large, 30oz. premium adhesive needed to glue subfloor decking to floor
joists. This helps prevent the
|
|
subfloor decking from squeaking.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2ND STORY SUB-FLOOR SYSTEM (
if applicable per design )
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Floor Joist,
2nd Story:
|
|
|
|
|
|
All
the graded 2" x 10", #2 or better lumber for the floor joists
spaced at 16" on center to ensure a strong, firm subfloor.
|
|
|
|
|
|
|
|
|
|
|
|
|
Subfloor
Decking, 2nd Story:
|
|
|
|
|
|
All
the 3/4" tongue and groove premium grade subfloor underlayment. These 4'
x 8' sheets carry a 50 - year
|
|
limited warranty against delamination and swelling from water for superior
performance.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Bridging:
|
|
|
|
|
|
|
|
|
|
|
All
the light tension, metal bridging needed for the floor joists at 16" on
center. This keeps the bottom
|
|
of
the floor joists from deflecting thus preventing floor sag.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Subfloor Adhesive:
|
|
|
|
|
|
|
|
|
|
All
the large, 30oz. premium adhesive needed to glue subfloor decking to floor
joists. This helps prevent the
|
|
subfloor decking from squeaking.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
INTERIOR FRAMING SYSTEM
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Interior
walls:
|
|
|
|
|
|
|
|
|
|
All
the graded 2" x 4", #2 or better lumber for the interior framing
studs and plates at 16" on center.
|
|
These
are used for the load bearing and the partition walls.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Plumbing
walls:
|
|
|
|
|
|
|
|
|
|
All
the graded 2" x 6", #2 or better lumber for the framing studs and
plates at 16" on center for the plumbing walls.
|
|
|
|
|
|
|
|
|
|
|
|
|
Gusset
Studs:
|
|
|
|
|
|
|
|
|
|
All
the 2" x 4", #2 or better lumber used in conjunction with the
provided LOG HOG ( by OMG ) screws.
|
|
These
components are used to fasten the interior framed walls to the exterior log
walls where specified per design.
|
|
|
|
|
|
|
|
|
|
|
|
|
Headers:
|
|
|
|
|
|
|
|
|
|
|
All
the graded 2" x 10", #2 or better lumber for interior headers above
all interior doors in load bearing walls.
|
|
|
|
|
|
|
|
|
|
|
|
|
Ceiling
Joists:
|
|
|
|
|